Mechanical & Electrical Support
   Bulk vessels

   Multi purpose vessels

   Fishing vessels

   Container vessels

   Faroe Islands

   MES incl present location

   MES work reference list

   Tanker vessels

   Various vessels

   Ship Yards

   MES various

   New building

   Cement carries

   Gas tankers


 
  01-07-2020

MES engineers location


Location for our engineers as follows:

Ulf Strmbck:
Marine engineer - Tanker expert - Standby for new project.

Kri Jensen:
Marine engineer - DD and repair Supt - Zhoushan China.

Karu Karuppian:
Paint supervisor/worker - Standby for new project.

Kenneth Joensen:
Marine engineer - DD and repair Supt - Standby for new projects.

Peter Brodersen:
Marine engineer - DD and repair Supt - Standby for new projects.

Jan Rjkjr:
Elec Supt - DD and repair/conversion - Standby for new projects.

Bogi Linklett:
Marine engineer - DD and repair Supt - Zhoushan China.

Jiao Leiqing:
Steel supervisor - New building and repair - Zhoushan China.

Sun Jianjin:
Steel supervisor - New building and repair - Zhoushan China.


 Read more . . . . . . 


01-07-2020

MES World Wide - 13 years anniversary


Today 01 July 2020 MES World Wide services have 13 years anniversary. Since we started 01 July 2007 we have carried out 324 projects, some small but also some huge.

Vessel type was:
Tanker vessels: 148 projects which include 89 dry docking hereof 27 projects with 3SS/CAP1 and 3 projects with SS4/CAP1.
Project heavy lift vessels: 49 projects which include 21 dry dockings mostly SS2 and SS3.
Container vessels: 36 projects which include dry dockings and Site Manager for Emma Mrsk in Palermo after flooding of engine room and Site Manager for Maersk Honam in Dubai after cargo hold fire.
Bulk vessels: 33 projects which include 17 dry dockings.
Fishing vessels: 30 projects which include dry dockings and upgrades.
Cement carries: 20 projects which include 5 dry dockings, 1 SS3, 1 SS4, 2 SS6 and 1 SS8 class renewal.
Gas tankers: 4 projects.
ROPAX: 2 projects. One dry docking which included renewal of fin stabilizers.
Car carrier: 1 project and finally Industry: 1 project.

Projects type in total:
Dry dockings: 152 projects.
Inspections incl S&P: 55 projects.
Repairs: 44 projects.
New building assistance incl UMS check: 26 projects.
Various tasks: 19 projects.
Vessel paint upgrades during DD and service: 22 projects.
Various Surveys or change class: 6 projects.

Companies we worked for during these years:
Clipper Group Copenhagen Denmark.
TORM Copenhagen Denmark.
Nordic Tankers Copenhagen Denmark.
APM Maersk Copenhagen Denmark.
Maersk Line Limited Norfolk USA.
Hamburg Sd Hamburg Germany.
Ultragas Gentofte Denmark.
Dannebrog Copenhagen Denmark.
DS NORDEN - Copenhagen Denmark.
Brise Bereederung Hamburg - Germany.
Essberger/DAL Hamburg Germany.
Framherji Fuglafjrur Faroe Islands.
Smyril Line Trshavn Faroe Islands.
Fleet management Hong Kong.
Eagle Bulk Stamford USA.
Lavaretus Copenhagen Denmark.

Today we are following staff in MES:
Ulf Strmbck Tanker expert. Ex Stolt Nielsen.
Kri Jensen DD and repair Supt. Ex Lauritzen.
Karu Karuppiah Paint supervisor/foreman. Ex Keppel SY, Maersk PCC.
Jan Rjkjr Electrical Supt. Ex Maersk Supply.
Kenneth Joensen Part Owner, DD and repair Supt. Ex Maersk Line and Maersk Supply.
Peter Brodersen Part Owner, DD and repair Supt. Ex APM-Maersk.
Bogi Linklett DD and repair Supt. Ex Maersk Line.
Jiao Leiqing Senior steel supervisor. Ex various new bd and repair projects in China.
Sun Jianjin Steel supervisor. Ex various new bd and repair projects in China.


 Read more . . . . . . 


12-05-2020

m/t Torm Thor - 1SS, scrubber installation and various upgrades


Project: 2020-07.
m/t Torm Thor have completed 1SS dry docking repairs incl scrubber installation and various upgrades at NASCO Shipyard - Zhoushan - China. From MES, DD Manager Bogi and Steel Supervisor Jiao assisted TORM with this project.

 Read more . . . . . . 


11-05-2020

Special Survey at Svedala Dock Yard


Our Tanker Expert Ulf Strmbck patience to come back in action after Corona lock down ran out, so he purchased an anchor incl chain and a hull.
Anchor and chain were measured according to rules and found within limit. Hull was blasted and nicely painted. His wife was happy with the Dock Yard in garden.

 Read more . . . . . . 


03-05-2020

m/t Torm Singapore - 2SS, Scrubber and BWTS installation


Project: 2020-06
m/t Torm Singapore have completed 2SS incl scrubber and BWTS installation at NASCO Shipyard - Zhoushan - China. From MES Kri and steel supervisor Jiao assisted TORM with this project.

 Read more . . . . . . 


14-04-2020

m/t Torm New Zealand - 2SS, scrubber and BWTS installation


Project: 2020-05
m/t Torm New Zealand have completed 2SS, scrubber and BWTS installation at NASCO Shipyard - Zhoushan Island. From MES DD manager Bogi and Steel Supervisor Jiao assisted TORM with this project.

 Read more . . . . . . 


28-03-2020

m/t Torm Timothy - Completed 1SS and scrubber installation


Project: 2020-04.
m/t Torm Timothy have completed 1SS dry docking repairs, various modifications incl scrubber installation at NASCO Shipyard - Zhoushan - China. From MES, Bogi and steel supervisor Jiao assisted TORM with this project.

 Read more . . . . . . 


26-02-2020

m/t Torm Amalie - Completed 2SS, scrubber and BWTS installation


Project: 2020-02.
m/t Torm Amalie have completed SS2, scrubber and BWTS installation at NASCO SY - Zhoushan - China. From MES, Kenneth assisted TORM with this project.

 Read more . . . . . . 


02-02-2020

m/t Torm Australia - 2SS, scrubber and BWTS installation


Project: 2020-01.
m/t Torm Australia completed 2SS repairs incl scrubber and BWTS installation at NASCO Shipyard - Zhoushan Islands - China. From MES, Steel Supervisor Sun assisted TORM with this project.

 Read more . . . . . . 


28-01-2020

m/t Torm Strong - Stop over at Skaw for guarantee follow up


Project: 2020-03
m/t Torm Strong stoppet over at Skaw in order to follow up on some guarantee matters. From MES, Ulf assisted TORM with this.

 Read more . . . . . . 


19-01-2020

m/t Torm Sofia - Completed 3SS, CAP, scrupper and BWTS


Project: 2019-23.
Torm Sofia has completed 3SS and CAP Survey at COSCO Changxing Shipyard - Shanghai. Furthermore scrubber plant and BWTS were installed. From MES following engineers assisted TORM with this project. Site Manager Peter, DD Manager Bogi, Elec Supt Jan and steel supervisor Jiao.

 Read more . . . . . . 


02-01-2020

m/t Torm Alice - Completed 2SS and upgrade


Project 2019-24
m/t Torm Alice have completed 2SS, BWTS and scrubber installation at NASCO Shipyard - Zhoushan - China. Kenneth and Steel Supervisor Sun assisted TORM with this project.

 Read more . . . . . . 


29-12-2019

m/tr Akraberg - Returning home after fishing in the North Atlantic


Project: 2019-26.
Our Paint Supervisor Karu have assisted Framherji with various paint upgrade during 25 years class survey and followed the vessel for fishing i the Barents Sea to complete the work. Karu managed to return home just before New Year. Very good.

 Read more . . . . . . 


04-12-2019

m/t Torm Signe - 3SS, CAP1 and scrubber and BWTS installation


Project: 2019-19.
Today m/t Torm Signe departed COSCO Changxing Shipyard and SS3/CAP1 repairs incl scrubber and BWTS installation. From MES Peter, Kri and Elec Sup Jan assisted TORM with this project.

 Read more . . . . . . 


25-11-2019

m/t Torm Astrid - Completed 2SS, BWTS and scrubber installation


Project: 2019-25.
m/t Torm Astrid have completed 2SS dry docking repairs incl BWTS and scrubber installation at NASCO Shipyard - Zhoushan - China. From MES Kenneth and steel supervisor Sun assisted TORM with this project.

 Read more . . . . . . 


29-10-2019

m/t Torm Arawa - Completed 2SS, scrubber & WBTS installation


Project: 2019-22.
m/t Torm Arawa have completed 2SS repairs incl scrubber and BWTS installation at NASCO Shipyard - Zhoushan Islands - China. From MES, Kenneth and Steel Supervisor Sun assisted TORM with this project.

 Read more . . . . . . 


20-10-2019

m/t Torm Emilie - Completed 3SS, CAP and scrubber installation


Project: 2019-17.
m/t Torm Emilie have completed 3SS, CAP survey and scrubber installation at COSCO Changxing Shipyard - Shanghai. From MES Site Manager Peter, DD Manager Bogi, Elec Supt Jan and Steel Supervisor Jiao assisted TORM with this project.

 Read more . . . . . . 


08-10-2019

m/tr Akraberg - Karu joining to assist with 5SS


Project: 2019-21.
Our Paint Supervisor Karu joined m/tr Akraberg to assist with paint upgrade during vessel 5 Special Survey, which will be carried out at MEST Shipyard - Skla - Faroe Islands

 Read more . . . . . . 


05-10-2019

m/t Torm Lilly - 2SS incl scrubber and BWTS installation


Project: 2019-17.
m/t Torm Lilly completed 2SS dry docking repairs incl scrubber - BWTS installation and various upgrades at NASCO Shipyard - Zhoushan - China. From MES DD Manager Ulf and Steel Supervisor Jiao assisted TORM with this project.

 Read more . . . . . . 


13-09-2019

m/t Torm Almena - 2SS, scrubber and BWTS installation completed


Project: 2019-18.
m/t Torm Almena have completed 2SS dry docking repairs incl scrubber and BWTS installation at NASCO Shipyard - Zhoushan - China. From MES, Kenneth and Steel Supervisor Sun assisted TORM with this project.

 Read more . . . . . . 


10-09-2019

m/t Torm Aslaug completed 2SS incl BWTS and scrubber installation


Project: 2019-20
m/t Torm Aslaug have completed 2SS dry docking repairs incl BWTS and scrubber installation at NASCO Shipyard - Zhoushan - China. From MES Kenneth and steel supervisor Sun assisted TORM with this project.

 Read more . . . . . . 


31-08-2019

m/t Torm Ismini - 3SS, CAP and scrubber installation completed


Project: 2019-16.
m/t Torm Ismini completed 3SS, CAP1 and scrubber installation at COSCO Changxing Shipyard - Shanghai. From MES following engineers assisted TORM with this project. Site Manager Peter, DD Manager Kri, Elec Supt Jan and Steel Supervisor Jiao.

 Read more . . . . . . 


20-05-2019

JS Greenstone became Happy Peregrine - Take over, 1SS and upgrades


pgc JS Greenstone from EVERGAS arrived CSSC Wenchong Shipyard and was taken over by ULTRAGAS and changed name to Happy Peregrine and fully re-coated and changed colour. Also 1SS and various upgrades/modifications were carried out. Our tanker expert Ulf assisted ULTRAGAS with this project.

 Read more . . . . . . 


18-05-2019

m/v Marstal Mrsk - Dry docking repair at CSIC Xingang Shipyard completed


Project: 2019-10.
m/v Marstal Mrsk visit CSIC Xingang Shipyard - Jianjin - China for dry docking repair, which is today completed and vessel return back to schedule. From MES, Peter and Steel Supervisor Jiao assisted MAERSK LINE with this project.

 Read more . . . . . . 


15-05-2019

Maersk Line - MES Site Office at CSIC Xingang Shipyard


Project: 2019-10.
Repair Manager Peter and Steel Supervisor Jiao managed to arrange luxury Site Office condition in the dock bottom, during the repair period.


 Read more . . . . . . 


10-05-2019

pgc Atlantic Gas - Paint upgrade main deck


Project: 2019-12.
Today our Paint Supervisor Karu joined the pgc Atlantic Gas on behalf of UltraGas in port of Napoli - Italy in order to make upgrade of the main deck coating condition. He signed of in Le Havre 19 Sept.

 Read more . . . . . . 


10-05-2019

pgc Happy Peregrine - 1SS docking repairs - final bottom inspection


A happy crew and Site team during final bottom inspection and time for a whole team photo.

 Read more . . . . . . 


08-05-2019

Good friends meet again in China


Captain on Marstal Mrsk Thorvald Hansen and Repair Manager Peter meet again after very long time. Both sailed together for a full contract in 1995 onboard Clara Mrsk on the West Africa run. Fantastic good memories, fantastic good crew colleague and a time you will never forget.

 Read more . . . . . . 


02-05-2019

m/v Mrsk McKinney Mller - DD repair completed


Project 2019-06.
Today we completed DD repair of m/v Mrsk Mckinney Mller at Beihai Qingdao Shipyard and vessel went back to schedule. Peter and Steel Supervisor Jiao which assisted MAERSK LINE with this project, travelled to Tianjin for another project.

 Read more . . . . . . 


02-05-2019

m/t Torm Saone - Technical inspection and preparation for DD


Project: 2019-07.
Bogi travelled to Curitiba - Brazil on behalf of TORM in order to carry out Technical Inspection and make preparation for forthcoming 3SS dry docking repairs incl modifications.

 Read more . . . . . . 


01-05-2019

m/t Torm Almena - Technical inspection and preparation for DD


Project: 2019-11.
Today Kari embark the m/t Torm Almena on behalf of TORM in the port of Hong Kong and join the vessel to Japan for Technical inspection and preparation of the forthcoming 2SS dry docking repairs incl installation of scrubber and BWTS.

 Read more . . . . . . 


01-05-2019

m/t Torm Aslaug - Technical inspection and DD preparation


Project: 2019-09.
Kenneth travelled to Singapore on behalf of TORM and joined m/t Torm Aslaug to Darwin - Australia for technical inspection and preparation for forthcoming 2SS dry docking repairs incl scrubber and BWTS installation.

 Read more . . . . . . 


20-04-2019

Steel supervisor Jiao in action


Project: 2019-06.
Mr. Jiao in full action during the repair.

 Read more . . . . . . 


18-04-2019

m/t Torm Gunhild - Technical inspection and DD preparation


Project: 2019-05.
Bogi travelled to San Luis - Brazil on behalf of TORM in order to carry out technical inspection and make preparation for forthcoming 4SS dry docking repairs

 Read more . . . . . . 


16-04-2019

m/v Mrsk McKinney Mller - Dry Docking repair


Project: 2019-06.
Today Peter travelled to CSIC Beihai Shipyard/Wuchuan Heavy Industry - Qingdao - China in order to assist MAERSK LINE with DD repairs of the vessel. Our Steel Supervisor Jiao also join the team.

 Read more . . . . . . 


15-03-2019

m/t Torm Horizon - Technical inspection and DD preparation


Project: 2019-04.
Bogi travelled to Istanbul to join m/t Torm Horizon on behalf of TORM for Technical Inspection and preparation for forthcoming 3SS dry docking repairs incl installation of BWTS. Bogi sign off at port of Izmir - Turkey.

 Read more . . . . . . 


16-02-2019

MES Christmas Party Feb 2019


For first time all MES DD Supt from Faroe Islands were home at the same time, and this was used for a postponed Christmas Party. A very nice evening. From left, Peter, Kri, Bogi, Kenneth and Pll.
It was unfortunately not possible for Mr. Ulf from Sweden to join, as he was hard working.

 Read more . . . . . . 


31-01-2019

m/t Torm Estrid - Completed 3SS dry docking repairs


Project: 2019-01
m/t Torm Estrid have completed 3SS/CAP1 dry docking repairs incl various upgrades at COSCO Changxing Island shipyard - Shanghai. From MES, Kenneth assisted TORM with this repair.

 Read more . . . . . . 


28-01-2019

pgc JS Greenstone - Take over inspection and DD spec


Our tanker expert Ulf joined pgc JS Greenstone from Holland to Algeciras in order to inspect the vessel before take over and prepare forthcoming dry docking, on behalf of UltraGas.

 Read more . . . . . . 


08-12-2018

m/t Torm Sara - 3SS, CAP and various upgrades


Project: 2018-16.
m/t Torm Sara have completed 3SS dry docking repairs incl CAP1 certification and various upgrades at ZTHI Shipyard - ZhouShan - China.
Fra MES Kri assisted TORM with this project.

 Read more . . . . . . 


30-11-2018

m/t Torm Gyda - Completed 2SS dry docking repairs at ASRY


Project: 2018-17.
m/t Torm Gyda have completed 2SS dry docking repairs incl various upgrades at ASRY Shipyard - Manama - Bahrain. From MES, Bogi assisted TORM with this project.

 Read more . . . . . . 


19-11-2018

m/t Torm Lotte - 2SS and various upgrade


Project: 2018-18.
m/t Torm Lotte have completed 2SS dry docking repairs incl various upgrades at Besiktas Shipyard - Yalova - Turkey. From MES, Ulf assisted TORM with this project.

 Read more . . . . . . 


31-10-2018

m/v Maersk Honam - Repairs at Dubai Dry Docks


Today Peter took over as Site Manager on behalf of Maersk Line at Dubai Dry Docks for the repairs of Maersk Honam which were planned at this location.

 Read more . . . . . . 


30-10-2018

m/t Torm Carina - 3SS, CAP1 and upgrade


Project: 2018-09.
m/t Torm Carina have completed 3SS dry docking repairs incl CAP1 rating and various upgrades at COSCO Changxing Shipyard - Shanghai - China. From MES, Site Manager Kenneth and DD Manager Bogi assisted TORM with this project.

 Read more . . . . . . 


23-10-2018

m/t Torm Louise - Completed 2SS at Besiktas Shipyard - Turkey


Project: 2018-14.
m/t Torm Louise have completed 2SS at Besiktas Shipyard - Yalova - Turkey. Ulf assisted TORM with this project.

 Read more . . . . . . 


05-10-2018

Pll and Peter on compass deck - Torm Maren - Wenchong SY


Project: 2018-07.
Pll and Peter enjoy sunset on Torm Maren during 2SS and upgrades at Wenchong SY - Guangzhou - China

 Read more . . . . . . 


13-09-2018

m/t Torm Camilla - 3SS, CAP1 and upgrade completed


Project: 2018-08.
m/t Torm Camilla have completed 3SS dry docking repairs incl CAP1 rating and various upgrades at COSCO Changxing Shipyard - Shanghai - China. From MES, Site Manager Kenneth and DD Manager Kri assisted TORM with this project.

 Read more . . . . . . 


14-03-2018

m/tr Akraberg - Paint supervisor back onboard


Our paint supervisor Karu is back onboard m/tr Akraberg in order to make paint upgrade while the Vessel are in service.

 Read more . . . . . . 


11-02-2018

m/t Torm Freya - 3 SS and CAP survey


m/t Torm Freya completed 3rd Special and CAP survey at CSSC Wenchong Dockyard - Guangzhou - China. Kri and Peter assisted TORM with this project.

 Read more . . . . . . 


16-01-2018

m/t Torm Gertrud - 3rd SS and CAP survey


m/t Torm Gertrud have completed 3rd Special and CAP survey at CSSC Wenchong Dockyard - Guangzhou - China. Ulf and Peter assisted TORM with this project.

 Read more . . . . . . 


29-11-2017

MES docking Supts at CSSC Wenchong Dockyard


For the first time ever, all our 4 docking Supts are located and working at the same shipyard. Kri, Ulf, Peter and Kenneth assisting TORM A/S with dry docking and CAP survey for Torm Caroline, Torm Valborg, Torm Gerd, Torm Gertrud and Torm Freya at CSSC Wenchong Dockyard - Guangzhou - China.

 Read more . . . . . . 


26-11-2017

m/t Torm Valborg - 3rd SS and CAP survey at CSSC Wenchong Dockyard


m/t Torm Valbord have completed docking and CAP survey at CSSC Wenchong Dockyard. Kenneth and Peter assisted TORM with this project.

 Read more . . . . . . 


24-11-2017

m/t Torm Caroline - 3rd SS and CAP survey


m/t Torm Caroline have completed 3rd Special and CAP Survey at CSSC Wenchong Dockyard - Guangzhou - China. Ulf assisted TORM with this project.Here together with Captain John Mrkre just before departure.

 Read more . . . . . . 


25-09-2017

m/t Torm Mary - Completed 3 SS and CAP Survey


m/t Torm Mary have completed 3rd Special and CAP Survey at HRDD Shipyard - Chongming Island - Shanghai. Peter and Kri assisted TORM with this project.

 Read more . . . . . . 


21-09-2017

m/t Torm Supreme - UMS and new building assistance


m/t Torm Supreme is delivered to TORM at Ulsan - S.Korea. Kenneth and Arnold assisted TORM with UMS and alarm check before departure.

 Read more . . . . . . 


08-09-2017

m/t Torm Sovereign - UMS and new building assistance


New Building m/t Torm Sovereign was delivered to TORM at Ulsan - S.Korea. Kenneth and Arnold assisted TORM with UMS and alarm test before vessels departure.

 Read more . . . . . . 


04-09-2017

m/tr Akraberg - Our paint supervisor Karu onboard for paint upgrade


Our paint supervisor Karu have completed his works onboard m/tr Akraberg. Now the vessel is on the way back home fully loaded. We wish Karu a very good vacation.

 Read more . . . . . . 


24-08-2017

CIC Cosco Chengxing Shipyard - Shanghai


Today Peter visit CIC Cosco Shipyard. This is the first visit since COSCO have taking over CIC repair yards. MES have assisted Clipper Group, Hamburg Sd and TORM with dry docking repairs at CIC Chengxing Shipyard. Totally around 20 vessels.

 Read more . . . . . . 


22-08-2017

m/t Torm Vita - Completed 3rd Special and CAP Survey


Today m/t Torm Vita departed HRDD Shipyard - Chongming Island - Shanghai after completed 3rd Special and CAP Survey. Kenneth Joensen assisted TORM with this job.

 Read more . . . . . . 


22-08-2017

Torm Vita and Torm Mary at HRDD Shipyard - Shanghai


Torm Vita and Torm Mary, sister vessels are both at HRDD Shipyard - Shanghai for 3rd Special and CAP Survey. Kenneth assist TORM with Torm Vita and Peter assist TORM with Torm Mary.

 Read more . . . . . . 


31-07-2017

m/t Torm Loire - Ready for departure after 3 Special Survey and upgrade


m/t Torm Loire have completed 3rd Special Survey and upgrade for CAP Survey and now ready to depart HRDD Shipyard - Chongming Island - Shanghai. Kri Jensen assisted TORM with this repair.

 Read more . . . . . . 


27-07-2017

m/v Maersk Kinloss - Electrical assistance during SS2


m/v Maersk Kinloss dry docked at ASRY Shipyard - Bahrain for 2 Special Survey. Our Electrical Engineers Arnold and Smun assisted Maersk Line Limited with eletrical Work in connection with this.

 Read more . . . . . . 


27-07-2017

Torm Loire, Torm Vita and Torm Mary at HRDD Shipyard


All 3 TORM tankers, Torm Loire, Torm Vita and Torm Mary at HRDD Shipyard - Chongming Island - Shanghai for SS3 and CAP upgrade.

 Read more . . . . . . 


20-06-2017

m/v Maersk Hartford - Completed 2 SS at ASRY Bahrain


m/v Maersk Hartford completed 2 SS dry docking repairs at ASRY Shipyard - Bahrain. Peter assisted Maersk Line Limited with this project.

 Read more . . . . . . 


15-06-2017

m/v Maersk Hartford - Electrical assistance during SS 2 dry docking repairs


m/v Maersk Hartford dry docked at ASRY Shipyard for 2SS. In connection with this, our Electrical Engineers Arnold and Smun assisted Maersk Line Limited with electrical Works.

 Read more . . . . . . 


11-04-2017

m/v Maersk Chicago - Completed 2nd SS at ASRY Shipyard


m/v Maersk Chicago have completed 2nd Special Survey at ASRY Shipyard - Bahrain. Peter assisted Maersk Line Limited as DD Manager and our Electrical Engineers Arnold and Smun with electrical works.

 Read more . . . . . . 


23-03-2017

m/t Torm Venture and m/v Maersk Chicago at ASRY with MES assistance


m/t Torm Venture and m/v Maersk Chicago was at ASRY Shipyard during the same period. Ulf assisted TORM with Torm Venture and Peter assisted MLL with Maersk Chicago.

 Read more . . . . . . 


23-03-2017

Ulf Strmbck take a break after a long day at ASRY


This afternoon we meet Ulf Strmbck outside Supt Office at ASRY Shipyard, enjoying a cup of coffee after a long and hot day.

 Read more . . . . . . 


07-01-2017

m/tr Hgaberg - New fishing vessel to Framherji


Today Kenneth and Peter was invited onboard the fishing vessel TORBAS, which Company Framherji have purchased from Norway.The vessel arrived Torshavn 1000hrs and went for a presentation trip to the home port, where the local brass band entertained during the welcome ceremony. The vessel is only 2 years old and will be renamed HGABERG. MES have worked regularly for Framherji since 2007. We wish Fremherji all the best with the new vessel.

 Read more . . . . . . 


06-01-2017

m/tr Hgaberg - New fishing vessel




 Read more . . . . . . 


13-11-2016

m/tr Akraberg - Painter foreman Karu completed paint upgrade


Today our paint foreman Karu sign off m/tr Akraberg in Troms - Norway, after completed paint upgrade during Vessel was fishing.
He was 6 weeks onboard.

 Read more . . . . . . 


06-11-2016

m/t Torm Rosetta - Dry docking and upgrade


Peter and Kri have assisted TORM with dry docking and upgrade of m/t Torm Rosetta at HRDD Shipyard - Shanghai - China

 Read more . . . . . . 


08-10-2016

m/v Clipper Nestorio - Take over and 1SS Dry Docking repair


m/v Clipper Nestorio(ex Nord London) completed take over and 1SS dry docking repairs at Besiktas Shipyard - Yalova - Turkey.
Kenneth assisted Clipper Fleet Management with this project.

 Read more . . . . . . 


30-09-2016

m/tr Fagraberg - Our paint foreman Karu completed his work onboard


Today our paint foreman Karu completed paint upgrade onboard and sign off. He sign on during vessel dry docking and upgrade at Karstensen Shipyard - Skagen and joined the vessel during fishing to complete his works.

 Read more . . . . . . 


17-09-2016

m/t OWL - Performance and speed test after dry docking


Kenneth joined the bulk carrier OWL from Eagle Bulk Management, after dry docking at Besiktas Shipyard to carry out performance and speed test.

 Read more . . . . . . 


12-09-2016

m/t Torm Garonne - Completed dry docking and upgrade


m/t Torm Garonne completed dry docking and upgrade to CAP standard at HRDD Shipyard - Shanghai. Peter assisted Torm with this project.

 Read more . . . . . . 


07-09-2016

m/v Clipper Panorama - Take over and 1SS incl DD repair


m/v Clipper Panorama completed take over and 1SS dry docking repairs at Besiktas Shipyard - Yalova - Turkey.
Ulf assisted Clipper Fleet Management with this project.

 Read more . . . . . . 


10-08-2016

m/t Torm Maren - Check of steering gear system


During Vessel dry docking repairs at HRDD Shipyard, Peter went onboard to carry out normal check of Vessel steering gear system.

 Read more . . . . . . 


04-08-2016

m/tr Fagraberg - Complete full paint upgrade of hull, deck and RSV tanks


m/tr Fagraberg have completed full paint upgrade of hull, deck, RSV tanks and other upgrades at Karstensen Shipyard - Skagen - Denmark. Kenneth assisted Framherji with this project.

 Read more . . . . . . 


10-06-2016

m/t Torm Marie - Completed 2SS at HRDD Shipyard


Today m/t Torm Marie completed 2SS at HRDD Shipyard - Shanghai. Kri and Peter assisted TORM with this project.

 Read more . . . . . . 


30-05-2016

m/t Torm Vita - Completed afloat repairs


m/t Torm Vita completed afloat repairs at Montreal - Canada. Ulf assisted TORM with supervision and inspection.

 Read more . . . . . . 


18-05-2016

m/t Torm Marie - Dryd docking at HRDD Shipyard - Shanghai


Peter travelled to Shanghai to assist TORM A/S with dry docking repairs and 2nd Special Survey of m/t Torm Marie at HRDD Shipyard - Chongming Island - Shanghai.
Torm Marie is a LR2 tanker Vessel.

 Read more . . . . . . 


13-05-2016

m/t Prisco Elizaveta - Inspection


Ulf was asked to carry out inspection of m/t Prisco Elizaveta during vessels port stay Rotterdam.

 Read more . . . . . . 


08-05-2016

m/t Prisco Alexandra - Inspection


Ulf was asked to carried out inspection of m/t Prisco Alexandra during Vessel Copenhagen call.

 Read more . . . . . . 


29-04-2016

m/t Torm Margrethe - 2SS dry docking repairs at CIC Changxing Shanghai


m/t Torm Margrethe completed 2SS dry docking repairs at CIC Changxing Island - Shanghai. Peter assisted TORM A/S with this project.

 Read more . . . . . . 


24-04-2016

m/t Torm Kansas - Completed 2SS Dry Docking repairs at HRDD


m/t Torm Kansas have completed 2SS Dry Docking repairs at HRDD Shipyard - Chongming Island - Shanghai. Kenneth & Kri assisted TORM A/S with this project.

 Read more . . . . . . 


05-04-2016

m/t Torm Amazon - Completed 3SS and CAP upgrade


m/t Torm Amazon have completed 3SS dry docking repairs and CAP upgrade at CIC Changxing Shipyard - Shanghai. Kenneth, Ulf and Peter assisted TORM with this project.

 Read more . . . . . . 


01-02-2016

m/t Torm Cecilie - Completed 3SS and CAP upgrade


Torm Cecilie have completed 3SS dry docking repairs and CAP upgrade at CIC Changxing Shipyard - Shanghai. Peter assisted TORM at the end of this project.

 Read more . . . . . . 


22-01-2016

m/t Nord Goodwill - Inspection of vessel


Ulf travelled to Busan - S-Korea for technical inspection of the Vessel. This is our first project for NORDEN DS.

 Read more . . . . . . 


20-01-2016

m/t Torm Clara - Completed 3SS DD repairs and CAP upgrade


Today m/t Torm Clara departed CIC Changxing Shipyard - Shanghai after 3 Special Survey dry docking repairs and CAP upgrade. Kri and Peter assisted TORM A/S with this project.

 Read more . . . . . . 


31-12-2015

TORM New Year Party at Blue Marlin - Shanghai


As m/t Torm Clara, m/t Torm Cecilie and m/t Torm Amazon were at CIC Changxing Shipyard during Christmas and New Year, we arranged a New Year Party for Torm Site Team, CIC Team and the crew from all 3 vessels. A very good night.

 Read more . . . . . . 


10-12-2015

m/t Torm Neches - Completed 3SS and CAP upgrade


Today m/t Torm Neches departed CIC Changxing Shipyard - Shanghai after 3SS dry docking repairs and CAP upgrade. Kenneth and Peter assisted TORM A/S with this project.

 Read more . . . . . . 


06-12-2015

MES - All 4 Marine engineers at same place for first time


Today all 4 MES marine engineers meet at CIC Changxing Shipyard. Peter, Kenneth and Kri have one vessel each at CIC Changxing Shipyard, and Ulf was on the way to another project at Zhoushan Island South of Shanghai.

 Read more . . . . . . 


20-10-2015

Ulf assisted Nasco SY during DD of Clipper New York




 Read more . . . . . . 


20-10-2015

mpp Clipper New York - Completed 1SS at NASCO SY - Zhoushan - China


mpp Clipper New York have completed 1SS at NASCO SY - Zhoushan Island. Ulf assisted Clipper Fleet Management with this project.

 Read more . . . . . . 


29-09-2015

m/v Clipper Kythira - Ready for service


Now m/v Clipper Kythira is ready for service after take over, dry docking and small upgrades. Kenneth and Peter assisted CFM with this project.

 Read more . . . . . . 


26-09-2015

m/v Clipper Kalavryta - Ready for service after take over


After dry docking and small upgrades, m/v Clipper Kalavryta is ready for service. Peter and Kenneth assisted CFM A/S.

 Read more . . . . . . 


23-09-2015

2 bulk new buildings to Clipper


In September Clipper took over 2 bulk new Buildings in Shanghai which was both dry dock at CIC Changxing Shipyard for bottom inspection and modification of propeller. Peter assisted CFM - Clipper Fleet Management with shipyard booking, supervision of modification, take over and finally make Vessel ready for service. Both vessels were dry docked at same time in the VLCC floating dock.

 Read more . . . . . . 


23-09-2015

m/v Clipper Kalavryta and Clipper Kythira - UMS check after delivery


Kenneth and Hjalti from MES together with Kurt from CFM carried out UMS test and all small electrical issue after take over of both vessels. Also Kenneth and Kurt joined both vessels to first loading port.

 Read more . . . . . . 


02-08-2015

m/t Torm Trinity - 3SS dry docking repairs and CAP upgrade


m/t Torm Trinity have completed 3SS dry docking repairs and CAP upgrade at CIC Changxing Shipyard - Shanghai. Kri and Peter assisted TORM A/S with this project.

 Read more . . . . . . 


16-06-2015

m/t Torm Helvig - Completed 2SS and DD repairs at Besiktas SY


m/t Torm Helvig have completed 2SS incl Dry Docking repairs at Besiktas Shipyard - Turkey. Ulf assisted TORM with this project.

 Read more . . . . . . 


21-04-2015

Sungdong Shipbuilding - South Korea


Today Peter visit Sungdong Shipbuilding - South Korea on behalf of TORM A/S.

 Read more . . . . . . 


05-01-2015

m/t Torm Signe - 2SS, Mewis duct and PBCF installation


Torm Signe completed 2SS, MEVIS Duct and PBCF installation at CIC Changxing Shipyard - Shanghai China. Peter assisted TORM with this project.

 Read more . . . . . . 


10-10-2014

m/v Torm Bornholm - Completed 2SS dry docking repairs


m/v Torm Bornholm have completed 2SS dry docking repairs at COSCO Zhoushan Shipyard. Peter assisted TORM A/S with this repair.

 Read more . . . . . . 


29-07-2014

m/v Clipper Lotus - Completed 1SS dry docking repairs


m/v Clipper Lotus completed 2SS dry docking repairs at CIC Dongguo Branch - Shanghai.
Peter assisted CFM - Clipper Fleet Management A/S with this project.

 Read more . . . . . . 


14-06-2014

lpg/c Polargas - Inspection


Today Peter returned home after inspection onboard lpg/c Polargas from Ultragas. Peter sign on at Algiers and sign off Off Valletta - Malta.

 Read more . . . . . . 


08-06-2014

m/v Langballig - Electrical repairs and inspection


Today Peter sign off m/v Langballig in Wismar - Germany after joining the Vessel from Paldiski near Tallinn - Estonia for electrical repairs and docking inspection.

 Read more . . . . . . 


19-05-2014

m/v Monte Sarmiento - Dry docking and 2 SS at HRDD Shipyard


Today Peter completed his Work assisting Columbo ShipManagement - Hamburg Sd with dry docking repairs for m/v Monte Sarmiento at HRDD Shipyard - Chongming Island - Shanghai.

 Read more . . . . . . 


11-05-2014

m/v XO Lion - Assistance after take over management


Today Kenneth travelled home after assisting Clipper Fleet Management after take over of the Vessel in management.

 Read more . . . . . . 


11-05-2014

m/v Monte Pascoal - Renewal of bow truster afloat


Today m/v Monte Pascoal departed HRDD Shipyard - Chongming Island - Shanghai after renewal of bow thruster gearbox afloat.
Peter assisted Columbo Shipmanagement with this repair.

 Read more . . . . . . 


27-04-2014

m/v XO Tiger - Now in Management by Clipper Fleet Management


Today Peter travelled home after assisting CFM to take over m/v XO Tiger in management and supervise various repairs.

 Read more . . . . . . 


26-04-2014

m/v XO Tiger - Alarm check during change of management


Today Jogvan Elias travelled home after check and repair of vessels alarm system.

 Read more . . . . . . 


22-04-2014

m/v Clipper Triumph - Completed 1st Special Survey and dry docking repairs


Today m/v Clipper Triumph departed Besiktas Shipyard - Yalova - Turkey after completed 1st Special and Dry docking repairs.
Kenneth assisted Clipper Fleet Management with this job.

 Read more . . . . . . 


16-04-2014

m/v Clipper Lis - Completed dry docking repairs and 1st Special Survey


Today Clipper Lis departed Besiktas Shipyard - Yalova - Turkey after dry docking repairs and completed 1st Special Survey.
Kenneth assisted Clipper Fleet Management with this project.

 Read more . . . . . . 


28-02-2014

m/v Monte Pascoal - Departed CIC Changxing Shipyard after dry docking repairs


Today m/v Monte Pascoal departed CIC Changxing Shipyard - Shanghai after dry docking repairs.
Peter assisted Columbus Shipmanagement - Hamburg Sd with this repair during Chinese New Year.

 Read more . . . . . . 


27-02-2014

m/v Clipper Terminus - Departed from Besiktas Shipyard after dry docking repairs


Today m/v Clipper Terminus departed from Besiktas Shipyard - Yalova - Turkey, after dry docking repairs and completed 1st Special Survey.
Peter assisted Clipper Fleet Management with this repair.

 Read more . . . . . . 


25-02-2014

m/v Monte Cervantes - Departed CIC Changxing Shipyard after dry docking repairs


Today m/v Monte Cervantes departed CIC Changxing Shipyard - Shanghai after dry docking repairs.
Peter assisted Columbus Shipmanagement - Hamburg Sd with this repair during Chinese New Year.

 Read more . . . . . . 


20-02-2014

m/v Clipper Tradition - Completed 1SS dry docking repairs at Besiktas Shipyard


Today m/v Clipper Tradition departed Besiktas Shipyard - Yalova - Turkey after completed 1 SS docking repairs.
Kenneth assisted Clipper Fleet Management with this job.

 Read more . . . . . . 


12-02-2014

m/v Clipper Magdalena departure from SCSC Minnan Shipyard


Today m/v Clipper Magdalena departed from SCSC Minnan Shipyard - Shanghai after dry docking repairs.
Peter assisted Clipper Fleet Management with this job.

 Read more . . . . . . 


11-02-2014

m/v Monte Olivia departed CIC Changxing Shipyard after dry docking repair


Today m/v Monte Olivia departed from CIC Changxing Shipyard after dry docking repairs.
Peter assisted Columbus Shipmanagement - Hamburg Sd with this dry docking.

 Read more . . . . . . 


10-02-2014

m/v Clipper Mistral departure from Besiktas Shipyard


Today m/v Clipper Mistral departed from Besiktas Shipyard - Yalova - Turkey after dry docking repairs and 3 SS.
Kenneth assisted Clipper Fleet Management with this repair.

 Read more . . . . . . 


25-01-2014

Hamburg Sd - Monte class vessels for dry docking


Today third vessel m/v Monte Pascoal arrived the shipyard.
First vessel was m/v Monte Cervantes.
Second vessel was m/v Monte Olivia.
Peter assisting Columbus Shipmanagement - Hamburg Sd superintendent with these docking repairs at CIC Changxing Shipyard.

 Read more . . . . . . 


20-01-2014

m/v Clipper Marinus - Departed CIC Lixin SY at Huangpu River - Shanghai




 Read more . . . . . . 


19-01-2014

m/v Clipper Marinus - Departed CIC Lixin Shipyard after dry docking repairs


Today m/v Clipper Marinus departed CIC Lixin Shipyard - Sanlin Branch after dry docking repairs.
Peter attended this job for Clipper Fleet Management A/S.

 Read more . . . . . . 


29-12-2013

MES reference list 2013




 Read more . . . . . . 


15-12-2013

m/v Clipper Titan completed dry docking repairs at Besiktas


Today m/v Clipper Titan departed Besiktas Shipyard after dry docking repairs.

Kenneth attended this job.

 Read more . . . . . . 


08-12-2013

MES work list 2007




 Read more . . . . . . 


29-11-2013

m/v Clipper Lasco - Paint touch up on deck after dry docking


Today our paint foreman Karu sign off the vessel in Jakarta - Indonesien, after 3 weeks of paint touch up on vessels main deck after dry docking repairs ect.

 Read more . . . . . . 


26-11-2013

m/v Falshoeft - Assistance for main engine repair


Today we assisted Brise Bereederungs GmbH - Hamburg to arrange top urgent service team in Shanghai for main engine repairs.

 Read more . . . . . . 


08-11-2013

m/v Clipper Lasco - Completed dry docking repairs at CIC Lixin Shipyard


Today m/v Clipper Lasco departed CIC Lixin Shipyard - Shanghai after completed dry docking repairs and 2 Special survey.
Peter supervised this repair.

 Read more . . . . . . 


08-11-2013

m/v Clipper Trader - Completed dry docking repairs and 1 Special Survey


Today m/v Clipper Trader departed Besiktas Shipyard - Yalova - Turkey, after completed 1 Special Survey and dry docking repairs.
Vessel arrived Besiktas 29.October.
Kenneth supervised this dry docking repair.

 Read more . . . . . . 


27-09-2013

m/v Clipper Valour - Completed dry docking repairs and 2nd Special Survey


Today m/v Clipper Valour departed CIC Lixin Shipyard - Donggou Branch - Shanghai after completed dry docking repairs and 2nd Special Survey.
Kenneth supervised this repair.

 Read more . . . . . . 


06-09-2013

m/v Clipper Hope - Handed over to new owners


Today Clipper Hope was handed over to new owner at Lvhuashan Anchorage - China.
Kenneth assisted with this task.

 Read more . . . . . . 


01-09-2013

m/v Clipper Galaxy - Completed dry docking repairs and conversion at CIC Lixin Sanlin Shipyard


Today m/v Clipper Galaxy departed CIC Lixin Sanlin Shipyard after dry docking repairs and conversion with bulbous bow, propeller fairing cone, rudder bulb and fixed ballast. The Work was carried out in extreme weather condition, with temperature well above 40 dg.C for more than 2 weeks.
The Work was supervised by Peter & Flemming.

 Read more . . . . . . 


31-08-2013

m/t Harbour Krystal - Steel repair in cargo tanks


Today Kenneth completed supervision of steel repairs in forward cargo tanks, during portstay Malaga Spain.

 Read more . . . . . . 


16-08-2013

m/t Kronborg - Steel repair


Today Len Williams completed supervision of steel repair of vessels forward area. This repair was carried out at repair berth Rosario - Argentina.

 Read more . . . . . . 


25-07-2013

m/v Emma Maersk - Repairs at Fincantieri Shipyard after engine room flooding


11.Feb Petur joined the planning/repair team for Emma Maersk at Esplanaden and became Site Manager at Fincantieri during the whole repair period. Vessel left Fincantieri Shipyard 14.July for shifting to Anchorage for various test, before the sea trial was started.
Peter left Palermo 25.July.

 Read more . . . . . . 


18-06-2013

m/v Clipper Century - Repair of cargo crane


Today Kenneth completed supervision of vessels cargo crane.

 Read more . . . . . . 


16-06-2013

m/v Clipper Mayflower - Hand over to new owners


Today Clipper Mayflower was handed over to new owners at Singapore Anchorage.
Kenneth attended this job.

 Read more . . . . . . 


15-06-2013

mpp Clipper Century - Completed 2SS dry docking repairs


Project: 2013-13.
mpp Clipper Century have completed 2SS dry docking repairs incl various upgrades at CIC Lixin Shipyard - Sanlin Branch - Shanghai - China. From MES, Peter assisted Clipper Group with this project.

 Read more . . . . . . 


13-06-2013

m/v Clipper Copenhagen - Completed dry docking and 3th SS


Today Clipper Copenhagen departed Lixin Sanlin Shipyard - Shanghai after dry docking repairs and completed 3th Special Survey.
Kenneth assisted CFM with this docking repair.

 Read more . . . . . . 


01-06-2013

m/v Emma Maersk - Mechanical engineers for final installations


MES arranged Kenneth and four mechanical engineers from MEST(Shipyard in Faroe Islands)for final installation of various Machinery and tools in the engine room.

 Read more . . . . . . 


11-04-2013

m/t Clipper Lagacy - Completed dry docking and 2nd SS


Today m/v Clipper Lagacy departed Besiktas Shipyard - Altinova - Turkey after completed dry docking repairs and 2nd Special Survey.
Kenneth attended this job.

 Read more . . . . . . 


06-04-2013

m/tr Fagraberg - Completed dry docking, coversion and modification


Today m/tr Fagraberg complated dry docking repairs, conversation of main deck and other modifications. The complete project was done in a few steps beginning in December 2012 in order to have the Vessel ready for the fishing season.
Peter and Kenneth supervised this project.

 Read more . . . . . . 


01-03-2013

Mechanical & Electrical Support


Niklas Kenneth Joensen and Peter Hjgaard Brodersen founded the Mechanical & Electrical Support in August 2006.

Mechanical & Electrical Support was founded in order to make repairs for the fishing industry and vessels in the Faroe Islands during our vacation from the sea.

Since that time we have attended more than 140 vessels, including 49 dry dockings, 13 new buildings take over, 52 repairs and modifications and 28 vessel inspections on behalf of various ship owners.

 Read more . . . . . . 


18-02-2013

m/t Clipper Kristin - Take over after bareboat charter


Today Kenneth completed take over Clipper Kristin after bareboat charter for a few years. Before take over various repairs were carried out.

 Read more . . . . . . 


09-02-2013

m/t Clipper Tobago - Handed over to new owners


Today m/t Clipper Tobago was handed over to new owners at Singapore Anchorage.
Peter attanded this job.

 Read more . . . . . . 


06-02-2013

m/v Maasholm - Inspection after steel damage


Today Peter travelled to Tanjung Pelepas for inspection and repair specification after a steel damaged.

 Read more . . . . . . 


29-01-2013

m/v CEC Fantasy - Handed over to new owners


Today m/v CEC Fantasy was handed over to new owners at Surabaya Anchorage.
Peter attended this job.

 Read more . . . . . . 


23-01-2013

m/v Clipper New York - Change of class and annual survey


Today m/v Clipper New York changed class from GL to LR. At the same time annual survey was carried out. This was carried out during cargo operation at port Qinhuangdao - China.
Peter attended this job.

 Read more . . . . . . 


12-12-2012

m/t Clipper Karina


m/t Clipper Karina Chemical Tanker Besiktas Shipyard Yalova Tuzla
September 2012 - Flag change and repairs.


 Read more . . . . . . 


01-09-2012

m/t Global Aker - TC inspection - Malta


m/t Global Aker Chemical Tanker Palumbo Malta Shipyard
September 2012 TC inspection and repair of SS cargo tanks.

 Read more . . . . . . 


05-05-2012

m/v Clipper Harmony dry docking at Besiktas Shipyard - Yalava - Turkey


m/v Clipper Harmony Bulk Vessel May 2012
Dry docking Besiktas Shipyard Yalova Istanbul - Turkey

 Read more . . . . . . 


03-04-2012

Family visit at CIC Lixin Sanlin Shipyard


During dry docking and upgrade of mpp Clipper Concord, where Kenneth and Peter assisted Clipper Fleet Management, family of both visit CIC Lixin Sanlin Shipyard and Shanghai. A fantastic week.

 Read more . . . . . . 


13-01-2012

m/v Clipper Commander - 3rd SS - CIC Lixin Sanlin Branch


m/v Clipper Commander Multi Purpose Vessel March 2012
Dry docking 3rd Special Survey Lixin Shipyard - Shanghai.


 Read more . . . . . . 


03-04-2011

m/t Nordic Oslo


m/t Nordic Oslo Chemical Tanker Off Manila Philippines
Technical inspection April 2011.

 Read more . . . . . . 


01-02-2011

New building: Clipper


Clipper G-class Multi purpose vessels. January 2011
New building assistance at Yangfan Shipyard Zhoushan Island.

About the photo: The Yangfan Shipyard

 Read more . . . . . . 


01-11-2007

m/t Clipper Tobago - SS cargo tank repair at port of Newark


m/t Clipper Tobago needed to carry out some repairs of one SS cargo tank during port stay at Newark - USA. From MES, Bjarne assisted Clipper Fleet Management with this repair.

 Read more . . . . . . 


01-08-2007

m/v Valbella - Inspection and DD specification


Peter traveled to Columbo - Sri Lanka on behalf of Essberger to inspect Cement Carrie VALBELLA and preparation of DD specification.

 Read more . . . . . . 


01-01-2001

m/tr Hvtanes - Now in Canada


m/tr Hvtanes is build at Skla Shipyard - Faroe Islands 1987(the hull was the last big project at Nakskov SY Denmark). Kenneth joined during new building and when delivered as CE. Peter joined in 1988 as 2E. A fantastic vessel and very good memories.

 Read more . . . . . . 


 HOME       

 ABOUT US

 THE STAFF

 INDEX

MECHANICAL
&
ELECTRICAL SUPPORT

Company details:
Sp/f MES
Birnugta 14
FO 100 Trshavn
Faroe Islands

+298-519735

V-number: 559679

mes@mes.fo

peter@mes.fo

kenneth@mes.fo



 Mechanical & Electrical Support