26-07-2022
m/t Torm Amorina - 2SS dry docking survey + scrubber and BWTS installation
Project: 2022-05
m/t Torm Amorina completed 2nd SS dry docking survey, incl scrubber and BWTS installation and a lot of upgrades… bridge equipments, hull coating X7, ballast and cargo tanks paint upgrade and much more. This project was carried out at NASCO SY – Zhoushan – China. From MES, DD Manager Peter and Steel Supervisor Sun assisted TORM with this project. Below photo show a happy repair team and a very nice vessel.
It is always a pleasure to be at part of a project, from a professional and strong Ship Owner. Thanks.
Read more . . . . . .
|
| |
19-06-2022
vlcc Navigare Terra Mater - Completed 1SS at IMC-ZY
Project: 2022-06
VLCC Navigare Terra Mater has completed 1SS dry docking survey included various upgrades i.e. hull coating system was changed to silicone X7. This project was carried out at IMC-ZY shipyard – Zhoushan and all done according to plan.
From MES, Peter assisted Navigare Capital A/S for this project as Owner Representative. This was also our first project for Navigare Capital A/S, and indeed a pleasure.
According to Danish Shipping news, VLCC Navigare Terra Mater was the biggest tanker vessel under Danish register, when vessel changed to Danish flag in 2021.
Read more . . . . . .
|
| |
26-03-2022
m/t Torm Emilie - Completed dry docking repairs at CSSC Wenchong
Project: 2202-02.
Today m/t Torm Emilie have completed dry docking repairs at CSSC Wenchong Shipyard, Guangzhou, China. From MES, Senior Steel Supervisors Jiao & Son assisted TORM with this project. Very well done.
Read more . . . . . .
|
| |
03-03-2022
m/t Torm Estrid - Completed ISS4/CAP1 incl BWTS installation
Project: 2201kj m/t Torm Estrid have completed ISS4/CAP1 dry docking survey incl BWTS at NASCO Shipyard, Zhoushan, China. From MES, Senior DD Supt Kenneth and Senior Steel Supervisor Sun assisted TORM with this project. Well done.
Read more . . . . . .
|
| |
24-01-2022
m/t Torm Adventure - Completed 3SS/CAP1 survey incl BWTS installation
Project: 2021-20. m/t Torm Adventure completed 3SS/CAP1 dry docking survey, BWTS installation and huge upgrade at NASCO Shipyard - ZhouShan - China. From MES, Kenneth and our Steel Supervisor Jiao assisted TORM with this project. Well done.
Read more . . . . . .
|
| |
24-01-2022
One out and one in at NASCO Shipyard
Today m/t Torm Adventure departed NASCO Shipyard after 3SS/CAP1 survey and Torm Estrid arrived NASCO Shipyard for ISS4/CAP1 survey. From MES, Kenneth and our Steel Supervisor Sun will assist TORM with this project.
Read more . . . . . .
|
| |
24-11-2021
m/t Effie Maersk - Completed 1SS docking survey incl modifications at Yiu Lian SY
Project: 2021-19.
m/t Effie Maersk completed 1st Special Docking Survey incl various upgrades/modifications at Yiu Lian Shipyard - Shekou - Shenzhen - China. Kenneth and Peter assisted Maersk Tankers with this project.
Read more . . . . . .
|
| |
28-10-2021
LPG vessels BW Frigg and BW Freyja - Dual fuel conversion of ME
Project: 2021-18. Peter assisted MAN on behalf of CS Electric to convert vessels main engine to dual fuel – Diesel and LPG at Yiu Lian Shipyard – Shekou – Shenzhen.
Read more . . . . . .
|
| |
04-09-2021
m/t Torm Sara - Completed ISS4/CAP1 dry docking and various upgrade
Project: 2021-13.
Today m/t Torm Sara completed ISS4/CAP1 dry docking survey included various upgrades at NASCO Shipyard – Zhoushan – China. Our Senior Steel Supervisor Jiao assisted TORM with this project. Well done.
Read more . . . . . .
|
| |
26-08-2021
m/t Zarby - ISS4 + CAP1 - Project completed
Project: 2021-14.
Today Ulf said good bay to m/t Zarby and the crew at Dry Dock World - Dubai, as the project was completed and all went well. We wish Ulf a nice vacation.
Read more . . . . . .
|
| |
04-08-2021
m/t Zarby - Dry docking - ISS4 + CAP1
Today our tanker expert Ulf Strömbäck travelled to Dubai in order to assist Luendra Tankers with this project.
Read more . . . . . .
|
| |
18-05-2021
m/t Torm Valborg - ISS4 dry docking survey incl CAP1 rating and upgrade
Project: 2021-09.
m/t Torm Valborg completed ISS4 dry docking survey incl CAP1 rating at COSCO SY - Changxing Island - Shanghai. Also vessel got a paint upgrade which you can see on attached photos.
Peter, Kenneth and our steel supervisor Jiao assisted TORM with this project.
Read more . . . . . .
|
| |
17-05-2021
m/t Torm Moselle - ISS4 docking survey incl CAP1
Project: 2021-11.
m/t Torm Moselle have completed ISS4 dry docking survey incl CAP1 survey at NASCO SY - Zhoushan - China. Our Steel Supervisor Sun assisted TORM with this project. We wish Mr. Sun a nice vacation.
Read more . . . . . .
|
| |
08-05-2021
m/t Torm Marina - 3SS dry docking survey - CAP1 incl scrubber and BWTS installation
Project: 2021-10.
m/t Torm Marina have completed 3SS dry docking survey incl CAP1 rating and installation of scrubber and BWTS at ZTHI SY, Zhoushan, China. Kenneth and our steel supervisor Sun assisted TORM with this project. All went well.
Read more . . . . . .
|
| |
10-03-2021
m/t Torm India - SS2 dry docking survey incl BWTS installation
Project: 2021-06.
m/t Torm India completed SS2 dry docking survey incl installation of BWTS at NASCO SY, Zhoushan, China. Our steel supervisor Sun assisted TORM with this project.
Read more . . . . . .
|
| |
26-02-2021
m/t Torm Louise - Afloat repair at Dunkerque - France
Project: 2021-08. Today our Senior Repair Bogi travelled to Dunkerque – France in order to assist TORM with afloat repairs during port stay. All went well.
Read more . . . . . .
|
| |
18-02-2021
m/t Torm Kansas - ISS4/CAP1 and various upgrade completed
Project: 2021-03. m/t Torm Kansas have completed ISS4/CAP1 dry docking survey incl various upgrade at NASCO Shipyard – Zhoushan – China. From MES, DD Supt Kenneth and Steel Supervisor Jiao assisted TORM with this project. Well done.
Read more . . . . . .
|
| |
19-01-2021
m/t Torm Thyra - Completed ISS4 at NASCO SY
Project: 2021-01.
m/t Torm Thyra completed ISS4/CAP1 dry docking repair and survey at NASCO Shipyard - Zhoushan area. MES Steel Supervisor SUN assisted TORM with this project.
Read more . . . . . .
|
| |
18-01-2021
m/t Torm Eric - Completed 3SS/CAP1 DD Survey incl BWTS installation
Project: 2020-26.
m/t Torm Eric completed 3SS/CAP1 DD survey incl BWTS installation at NASCO SY - Zhoushan area - China. Our MES Steel Supervisor Sun assisted during this project.
Read more . . . . . .
|
| |
24-12-2020
m/t Torm Torino - Completed 1SS DD survey incl scrubber installation
Project: 2020-25.
m/t Torm Torino completed 1SS DD survey incl scrubber installation at NASCO Shipyard - Zhoushan - China. Our MES Steel Supervisor Sun assisted TORM with this project.
Read more . . . . . .
|
| |
20-12-2020
m/t Torm Freya - Completed ISS4/CAP1 DD survey
Project: 2020-24.
m/t Torm Freya completed ISS4/CAP1 DD survey at NASCO Shipyard - Zhoushan area - China. MES Steel Supervisor Sun assisted TORM with this project.
Read more . . . . . .
|
| |
04-12-2020
m/t Torm Tevere - Completed SS3/CAP1 DD survey incl various upgrades
Project: 2020-22.
m/t Torm Tevere have completed SS3/CAP1 Dry Docking Survey incl various upgrades at NASCO Shipyard - Zhoushan - Chine. From MES DD Supt Kenneth, Site Manager Peter and Steel Supervisor Jiao assisted TORM with this project.
Read more . . . . . .
|
| |
30-10-2020
m/t Torm Platte - Completed SS3/CAP1 DD survey incl scubber & BWTS installation
Project: 2020-20.
m/t Torm Platte completed SS3/CAP1 Dry Docking Survey incl Scrubber and BWTS installation at NASCO Shipyard - Zhoushan - China. From MES, DD Supt Kenneth, Site Manager Peter and Steel Supervisor Jiao assisted TORM with this project.
Read more . . . . . .
|
| |
21-10-2020
m/t Torm Vita - Completed ISS4 DD survey
Project: 2020-19.
m/t Torm Vita successfully completed ISS4 DD Survey at NASCO Shipyard – Zhoushan area – China. From MES Peter and Steel Supervisor Sun assisted TORM with this project.
Read more . . . . . .
|
| |
30-09-2020
m/t Torm Thunder - Completed 1SS DD Survey incl installation of scrubber
Project: 2020-17.
m/t Torm Thunder successfully completed 1SS DD survey incl installation of scrubber. From MES, Peter and Steel Supervisor Sun assisted TORM with this project.
Read more . . . . . .
|
| |
20-09-2020
m/t Torm Thames - Completed 3SS/CAP1 DD survey incl scrubber & BWTS installation
Project: 2020-14.
m/t Torm Thames have successfully completed 3SS/CAP1 survey incl scrubber and BWTS installation at NASCO Shipyard – Zhoushan area – China. Kenneth, Peter and steel Supervisor Jiao assisted TORM with this project.
Read more . . . . . .
|
| |
31-08-2020
m/t Torm Titan completed SS1 DD Survey incl scrubber installation
Project: 2020-16.
m/t Torm Titan successfully completed 1SS DD survey incl installation of scrubber at NASCO Shipyard - Zhoushan - China. From MES, Peter and Steel Supervisor Jiao assisted TORM with this project.
Read more . . . . . .
|
| |
25-08-2020
m/t Torm Ragnhild - Completed 3SS/CAP1 DD Survey incl scrubber and BWTS installation
Project: 2020-13.
m/t Torm Ragnhild successfully completed 3SS/CAP1 DD survey incl scrubber and BWTS installation at NASCO Shipyard - Zhoushan area - China. Kári, Bogi and Steel Supervisor Jiao from MES assisted TORM with this installation.
Read more . . . . . .
|
| |
18-06-2020
m/t Torm Gudrun - Completed SS4/CAP1 DD survey and various upgrades
Project: 2020-09.
m/t Torm Gudrun have completed SS4/CAP1 dry docking survey incl various upgrades at ZHTI Shipyard - Zhoushan - China. From MES, DD Supt Kári and Steel Supervisor Jiao assisted TORM with this project.
Read more . . . . . .
|
| |
12-05-2020
m/t Torm Thor - 1SS, scrubber installation and various upgrades
Project: 2020-07. m/t Torm Thor have completed 1SS dry docking repairs incl scrubber installation and various upgrades at NASCO Shipyard - Zhoushan - China. From MES, DD Manager Bogi and Steel Supervisor Jiao assisted TORM with this project.
Read more . . . . . .
|
| |
03-05-2020
m/t Torm Singapore - 2SS, Scrubber and BWTS installation
Project: 2020-06 m/t Torm Singapore have completed 2SS incl scrubber and BWTS installation at NASCO Shipyard - Zhoushan - China. From MES Kári and steel supervisor Jiao assisted TORM with this project.
Read more . . . . . .
|
| |
14-04-2020
m/t Torm New Zealand - 2SS, scrubber and BWTS installation
Project: 2020-05 m/t Torm New Zealand have completed 2SS, scrubber and BWTS installation at NASCO Shipyard - Zhoushan Island. From MES DD manager Bogi and Steel Supervisor Jiao assisted TORM with this project.
Read more . . . . . .
|
| |
28-03-2020
m/t Torm Timothy - Completed 1SS and scrubber installation
Project: 2020-04. m/t Torm Timothy have completed 1SS dry docking repairs, various modifications incl scrubber installation at NASCO Shipyard - Zhoushan - China. From MES, Bogi and steel supervisor Jiao assisted TORM with this project.
Read more . . . . . .
|
| |
26-02-2020
m/t Torm Amalie - Completed 2SS, scrubber and BWTS installation
Project: 2020-02. m/t Torm Amalie have completed SS2, scrubber and BWTS installation at NASCO SY - Zhoushan - China. From MES, Kenneth assisted TORM with this project.
Read more . . . . . .
|
| |
02-02-2020
m/t Torm Australia - 2SS, scrubber and BWTS installation
Project: 2020-01. m/t Torm Australia completed 2SS repairs incl scrubber and BWTS installation at NASCO Shipyard - Zhoushan Islands - China. From MES, Steel Supervisor Sun assisted TORM with this project.
Read more . . . . . .
|
| |
28-01-2020
m/t Torm Strong - Stop over at Skaw for guarantee follow up
Project: 2020-03 m/t Torm Strong stoppet over at Skaw in order to follow up on some guarantee matters. From MES, Ulf assisted TORM with this.
Read more . . . . . .
|
| |
19-01-2020
m/t Torm Sofia - Completed 3SS, CAP, scrupper and BWTS
Project: 2019-23. Torm Sofia has completed 3SS and CAP Survey at COSCO Changxing Shipyard - Shanghai. Furthermore scrubber plant and BWTS were installed. From MES following engineers assisted TORM with this project. Site Manager Peter, DD Manager Bogi, Elec Supt Jan and steel supervisor Jiao.
Read more . . . . . .
|
| |
02-01-2020
m/t Torm Alice - Completed 2SS and upgrade
Project 2019-24 m/t Torm Alice have completed 2SS, BWTS and scrubber installation at NASCO Shipyard - Zhoushan - China. Kenneth and Steel Supervisor Sun assisted TORM with this project.
Read more . . . . . .
|
| |
04-12-2019
m/t Torm Signe - 3SS, CAP1 and scrubber and BWTS installation
Project: 2019-19. Today m/t Torm Signe departed COSCO Changxing Shipyard and SS3/CAP1 repairs incl scrubber and BWTS installation. From MES Peter, Kári and Elec Sup Jan assisted TORM with this project.
Read more . . . . . .
|
| |
25-11-2019
m/t Torm Astrid - Completed 2SS, BWTS and scrubber installation
Project: 2019-25. m/t Torm Astrid have completed 2SS dry docking repairs incl BWTS and scrubber installation at NASCO Shipyard - Zhoushan - China. From MES Kenneth and steel supervisor Sun assisted TORM with this project.
Read more . . . . . .
|
| |
20-10-2019
m/t Torm Emilie - Completed 3SS, CAP and scrubber installation
Project: 2019-17. m/t Torm Emilie have completed 3SS, CAP survey and scrubber installation at COSCO Changxing Shipyard - Shanghai. From MES Site Manager Peter, DD Manager Bogi, Elec Supt Jan and Steel Supervisor Jiao assisted TORM with this project.
Read more . . . . . .
|
| |
05-10-2019
m/t Torm Lilly - 2SS incl scrubber and BWTS installation
Project: 2019-17. m/t Torm Lilly completed 2SS dry docking repairs incl scrubber - BWTS installation and various upgrades at NASCO Shipyard - Zhoushan - China. From MES DD Manager Ulf and Steel Supervisor Jiao assisted TORM with this project.
Read more . . . . . .
|
| |
13-09-2019
m/t Torm Almena - 2SS, scrubber and BWTS installation completed
Project: 2019-18. m/t Torm Almena have completed 2SS dry docking repairs incl scrubber and BWTS installation at NASCO Shipyard - Zhoushan - China. From MES, Kenneth and Steel Supervisor Sun assisted TORM with this project.
Read more . . . . . .
|
| |
10-09-2019
m/t Torm Aslaug completed 2SS incl BWTS and scrubber installation
Project: 2019-20 m/t Torm Aslaug have completed 2SS dry docking repairs incl BWTS and scrubber installation at NASCO Shipyard - Zhoushan - China. From MES Kenneth and steel supervisor Sun assisted TORM with this project.
Read more . . . . . .
|
| |
31-08-2019
m/t Torm Ismini - 3SS, CAP and scrubber installation completed
Project: 2019-16. m/t Torm Ismini completed 3SS, CAP1 and scrubber installation at COSCO Changxing Shipyard - Shanghai. From MES following engineers assisted TORM with this project. Site Manager Peter, DD Manager Kári, Elec Supt Jan and Steel Supervisor Jiao.
Read more . . . . . .
|
| |
02-05-2019
m/t Torm Saone - Technical inspection and preparation for DD
Project: 2019-07. Bogi travelled to Curitiba - Brazil on behalf of TORM in order to carry out Technical Inspection and make preparation for forthcoming 3SS dry docking repairs incl modifications.
Read more . . . . . .
|
| |
01-05-2019
m/t Torm Almena - Technical inspection and preparation for DD
Project: 2019-11. Today Kari embark the m/t Torm Almena on behalf of TORM in the port of Hong Kong and join the vessel to Japan for Technical inspection and preparation of the forthcoming 2SS dry docking repairs incl installation of scrubber and BWTS.
Read more . . . . . .
|
| |
01-05-2019
m/t Torm Aslaug - Technical inspection and DD preparation
Project: 2019-09. Kenneth travelled to Singapore on behalf of TORM and joined m/t Torm Aslaug to Darwin - Australia for technical inspection and preparation for forthcoming 2SS dry docking repairs incl scrubber and BWTS installation.
Read more . . . . . .
|
| |
18-04-2019
m/t Torm Gunhild - Technical inspection and DD preparation
Project: 2019-05. Bogi travelled to San Luis - Brazil on behalf of TORM in order to carry out technical inspection and make preparation for forthcoming 4SS dry docking repairs
Read more . . . . . .
|
| |
15-03-2019
m/t Torm Horizon - Technical inspection and DD preparation
Project: 2019-04. Bogi travelled to Istanbul to join m/t Torm Horizon on behalf of TORM for Technical Inspection and preparation for forthcoming 3SS dry docking repairs incl installation of BWTS. Bogi sign off at port of Izmir - Turkey.
Read more . . . . . .
|
| |
31-01-2019
m/t Torm Estrid - Completed 3SS dry docking repairs
Project: 2019-01 m/t Torm Estrid have completed 3SS/CAP1 dry docking repairs incl various upgrades at COSCO Changxing Island shipyard - Shanghai. From MES, Kenneth assisted TORM with this repair.
Read more . . . . . .
|
| |
08-12-2018
m/t Torm Sara - 3SS, CAP and various upgrades
Project: 2018-16. m/t Torm Sara have completed 3SS dry docking repairs incl CAP1 certification and various upgrades at ZTHI Shipyard - ZhouShan - China. Fra MES Kári assisted TORM with this project.
Read more . . . . . .
|
| |
30-11-2018
m/t Torm Gyda - Completed 2SS dry docking repairs at ASRY
Project: 2018-17. m/t Torm Gyda have completed 2SS dry docking repairs incl various upgrades at ASRY Shipyard - Manama - Bahrain. From MES, Bogi assisted TORM with this project.
Read more . . . . . .
|
| |
19-11-2018
m/t Torm Lotte - 2SS and various upgrade
Project: 2018-18. m/t Torm Lotte have completed 2SS dry docking repairs incl various upgrades at Besiktas Shipyard - Yalova - Turkey. From MES, Ulf assisted TORM with this project.
Read more . . . . . .
|
| |
30-10-2018
m/t Torm Carina - 3SS, CAP1 and upgrade
Project: 2018-09. m/t Torm Carina have completed 3SS dry docking repairs incl CAP1 rating and various upgrades at COSCO Changxing Shipyard - Shanghai - China. From MES, Site Manager Kenneth and DD Manager Bogi assisted TORM with this project.
Read more . . . . . .
|
| |
13-09-2018
m/t Torm Camilla - 3SS, CAP1 and upgrade completed
Project: 2018-08. m/t Torm Camilla have completed 3SS dry docking repairs incl CAP1 rating and various upgrades at COSCO Changxing Shipyard - Shanghai - China. From MES, Site Manager Kenneth and DD Manager Kári assisted TORM with this project.
Read more . . . . . .
|
| |
11-02-2018
m/t Torm Freya - 3 SS and CAP survey
m/t Torm Freya completed 3rd Special and CAP survey at CSSC Wenchong Dockyard - Guangzhou - China. Kári and Peter assisted TORM with this project.
Read more . . . . . .
|
| |
16-01-2018
m/t Torm Gertrud - 3rd SS and CAP survey
m/t Torm Gertrud have completed 3rd Special and CAP survey at CSSC Wenchong Dockyard - Guangzhou - China. Ulf and Peter assisted TORM with this project.
Read more . . . . . .
|
| |
26-11-2017
m/t Torm Valborg - 3rd SS and CAP survey at CSSC Wenchong Dockyard
m/t Torm Valbord have completed docking and CAP survey at CSSC Wenchong Dockyard. Kenneth and Peter assisted TORM with this project.
Read more . . . . . .
|
| |
24-11-2017
m/t Torm Caroline - 3rd SS and CAP survey
m/t Torm Caroline have completed 3rd Special and CAP Survey at CSSC Wenchong Dockyard - Guangzhou - China. Ulf assisted TORM with this project.Here together with Captain John Mřrkřre just before departure.
Read more . . . . . .
|
| |
25-09-2017
m/t Torm Mary - Completed 3 SS and CAP Survey
m/t Torm Mary have completed 3rd Special and CAP Survey at HRDD Shipyard - Chongming Island - Shanghai. Peter and Kári assisted TORM with this project.
Read more . . . . . .
|
| |
21-09-2017
m/t Torm Supreme - UMS and new building assistance
m/t Torm Supreme is delivered to TORM at Ulsan - S.Korea. Kenneth and Arnold assisted TORM with UMS and alarm check before departure.
Read more . . . . . .
|
| |
08-09-2017
m/t Torm Sovereign - UMS and new building assistance
New Building m/t Torm Sovereign was delivered to TORM at Ulsan - S.Korea. Kenneth and Arnold assisted TORM with UMS and alarm test before vessels departure.
Read more . . . . . .
|
| |
22-08-2017
m/t Torm Vita - Completed 3rd Special and CAP Survey
Today m/t Torm Vita departed HRDD Shipyard - Chongming Island - Shanghai after completed 3rd Special and CAP Survey. Kenneth Joensen assisted TORM with this job.
Read more . . . . . .
|
| |
31-07-2017
m/t Torm Loire - Ready for departure after 3 Special Survey and upgrade
m/t Torm Loire have completed 3rd Special Survey and upgrade for CAP Survey and now ready to depart HRDD Shipyard - Chongming Island - Shanghai. Kári Jensen assisted TORM with this repair.
Read more . . . . . .
|
| |
27-07-2017
Torm Loire, Torm Vita and Torm Mary at HRDD Shipyard
All 3 TORM tankers, Torm Loire, Torm Vita and Torm Mary at HRDD Shipyard - Chongming Island - Shanghai for SS3 and CAP upgrade.
Read more . . . . . .
|
| |
06-11-2016
m/t Torm Rosetta - Dry docking and upgrade
Peter and Kári have assisted TORM with dry docking and upgrade of m/t Torm Rosetta at HRDD Shipyard - Shanghai - China
Read more . . . . . .
|
| |
12-09-2016
m/t Torm Garonne - Completed dry docking and upgrade
m/t Torm Garonne completed dry docking and upgrade to CAP standard at HRDD Shipyard - Shanghai. Peter assisted Torm with this project.
Read more . . . . . .
|
| |
10-08-2016
m/t Torm Maren - Check of steering gear system
During Vessel dry docking repairs at HRDD Shipyard, Peter went onboard to carry out normal check of Vessel steering gear system.
Read more . . . . . .
|
| |
10-06-2016
m/t Torm Marie - Completed 2SS at HRDD Shipyard
Today m/t Torm Marie completed 2SS at HRDD Shipyard - Shanghai. Kári and Peter assisted TORM with this project.
Read more . . . . . .
|
| |
30-05-2016
m/t Torm Vita - Completed afloat repairs
m/t Torm Vita completed afloat repairs at Montreal - Canada. Ulf assisted TORM with supervision and inspection.
Read more . . . . . .
|
| |
18-05-2016
m/t Torm Marie - Dryd docking at HRDD Shipyard - Shanghai
Peter travelled to Shanghai to assist TORM A/S with dry docking repairs and 2nd Special Survey of m/t Torm Marie at HRDD Shipyard - Chongming Island - Shanghai. Torm Marie is a LR2 tanker Vessel.
Read more . . . . . .
|
| |
13-05-2016
m/t Prisco Elizaveta - Inspection
Ulf was asked to carry out inspection of m/t Prisco Elizaveta during vessels port stay Rotterdam.
Read more . . . . . .
|
| |
08-05-2016
m/t Prisco Alexandra - Inspection
Ulf was asked to carried out inspection of m/t Prisco Alexandra during Vessel Copenhagen call.
Read more . . . . . .
|
| |
29-04-2016
m/t Torm Margrethe - 2SS dry docking repairs at CIC Changxing Shanghai
m/t Torm Margrethe completed 2SS dry docking repairs at CIC Changxing Island - Shanghai. Peter assisted TORM A/S with this project.
Read more . . . . . .
|
| |
24-04-2016
m/t Torm Kansas - Completed 2SS Dry Docking repairs at HRDD
m/t Torm Kansas have completed 2SS Dry Docking repairs at HRDD Shipyard - Chongming Island - Shanghai. Kenneth & Kári assisted TORM A/S with this project.
Read more . . . . . .
|
| |
05-04-2016
m/t Torm Amazon - Completed 3SS and CAP upgrade
m/t Torm Amazon have completed 3SS dry docking repairs and CAP upgrade at CIC Changxing Shipyard - Shanghai. Kenneth, Ulf and Peter assisted TORM with this project.
Read more . . . . . .
|
| |
01-02-2016
m/t Torm Cecilie - Completed 3SS and CAP upgrade
Torm Cecilie have completed 3SS dry docking repairs and CAP upgrade at CIC Changxing Shipyard - Shanghai. Peter assisted TORM at the end of this project.
Read more . . . . . .
|
| |
22-01-2016
m/t Nord Goodwill - Inspection of vessel
Ulf travelled to Busan - S-Korea for technical inspection of the Vessel. This is our first project for NORDEN DS.
Read more . . . . . .
|
| |
20-01-2016
m/t Torm Clara - Completed 3SS DD repairs and CAP upgrade
Today m/t Torm Clara departed CIC Changxing Shipyard - Shanghai after 3 Special Survey dry docking repairs and CAP upgrade. Kári and Peter assisted TORM A/S with this project.
Read more . . . . . .
|
| |
10-12-2015
m/t Torm Neches - Completed 3SS and CAP upgrade
Today m/t Torm Neches departed CIC Changxing Shipyard - Shanghai after 3SS dry docking repairs and CAP upgrade. Kenneth and Peter assisted TORM A/S with this project.
Read more . . . . . .
|
| |
02-08-2015
m/t Torm Trinity - 3SS dry docking repairs and CAP upgrade
m/t Torm Trinity have completed 3SS dry docking repairs and CAP upgrade at CIC Changxing Shipyard - Shanghai. Kári and Peter assisted TORM A/S with this project.
Read more . . . . . .
|
| |
16-06-2015
m/t Torm Helvig - Completed 2SS and DD repairs at Besiktas SY
m/t Torm Helvig have completed 2SS incl Dry Docking repairs at Besiktas Shipyard - Turkey. Ulf assisted TORM with this project.
Read more . . . . . .
|
| |
05-01-2015
m/t Torm Signe - 2SS, Mewis duct and PBCF installation
Torm Signe completed 2SS, MEVIS Duct and PBCF installation at CIC Changxing Shipyard - Shanghai China. Peter assisted TORM with this project.
Read more . . . . . .
|
| |
14-06-2014
lpg/c Polargas - Inspection
Today Peter returned home after inspection onboard lpg/c Polargas from Ultragas. Peter sign on at Algiers and sign off Off Valletta - Malta.
Read more . . . . . .
|
| |
16-08-2013
m/t Kronborg - Steel repair
Today Len Williams completed supervision of steel repair of vessels forward area. This repair was carried out at repair berth Rosario - Argentina.
Read more . . . . . .
|
| |
11-04-2013
m/t Clipper Lagacy - Completed dry docking and 2nd SS
Today m/v Clipper Lagacy departed Besiktas Shipyard - Altinova - Turkey after completed dry docking repairs and 2nd Special Survey. Kenneth attended this job.
Read more . . . . . .
|
| |
18-02-2013
m/t Clipper Kristin - Take over after bareboat charter
Today Kenneth completed take over Clipper Kristin after bareboat charter for a few years. Before take over various repairs were carried out.
Read more . . . . . .
|
| |
09-02-2013
m/t Clipper Tobago - Handed over to new owners
Today m/t Clipper Tobago was handed over to new owners at Singapore Anchorage. Peter attanded this job.
Read more . . . . . .
|
| |
12-12-2012
m/t Clipper Karina
m/t Clipper Karina – Chemical Tanker – Besiktas Shipyard – Yalova Tuzla September 2012 - Flag change and repairs.
Read more . . . . . .
|
| |
01-09-2012
m/t Global Aker - TC inspection - Malta
m/t Global Aker – Chemical Tanker – Palumbo Malta Shipyard September 2012 – TC inspection and repair of SS cargo tanks.
Read more . . . . . .
|
| |
03-04-2011
m/t Nordic Oslo
m/t Nordic Oslo – Chemical Tanker – Off Manila – Philippines Technical inspection – April 2011.
Read more . . . . . .
|
| |
01-11-2007
m/t Clipper Tobago - SS cargo tank repair at port of Newark
m/t Clipper Tobago needed to carry out some repairs of one SS cargo tank during port stay at Newark - USA. From MES, Bjarne assisted Clipper Fleet Management with this repair.
Read more . . . . . .
|
|
|
|
|
|
MECHANICAL
&
ELECTRICAL SUPPORT
Company details:
Sp/f MES
Birnugřta 14
FO – 100 Tórshavn
Faroe Islands
+298-519735
V-number: 559679
mes@mes.fo
peter@mes.fo
kenneth@mes.fo
|
|
|
|
|